Mining complexes are often forced to operate in environments characterized by one or several of the following factors: -Remote areas where power supplies are weak or
ConsultaDefinition. Power quality is a general term to represent the phenomena affecting to the user’s equipment when the AC power exceeds a certain limit. Fig. 1 shows the electricity waveform that serves as an indication of the quality of a power supply. It must be stable in terms of its amplitude, continuity, waveform shape, and frequency.
ConsultaMining complexes are often forced to operate in environments characterized by one or several of the following factors: . Remote areas where power supplies are weak or
ConsultaFig. 3. Block diagram of algorithm of the electrical complex of a coal mine model. The formation of a simulation model of the electrical complex includes implementation of the following phases: 1) Collection of the data on the equipment required for modelling of the electric drive of the key mining equipment: Shearer.
ConsultaOutdoor installation enables a smaller footprint and a reduced HVAC requirement for the E-houses. Transformer power is standardised to minimize the cost of spare units. The 11 kV/ 400 V transformers have a rated power of 1.6 MVA and Zsc 6% to keep In < 2500 A and Isc < 40 kA (including 400 V DOL motor contribution).
Consultafailure or misoperation of customer equipment”. In IEEE dictionary, power quality is defined as “the concept of powering and grounding. sensitive equipment in a matter that is suitable to the operation of that equipment”. IEC (International Electrotechnical Commission), it is defined as, “ set of parameters.
ConsultaElectric power quality is an aspect of power engineering that has been with us since the inception of power systems; however, topics in power quality have risen to the forefront since the advent of high power semiconductor switches and networking of transmission and subtransmission systems. Also, the trends in modern power engineering have been to
ConsultaAs the electrical energy cost for the coal mining industry is increasing every year, coal mining enterprises must conserve electrical energy for the reduction in output cost. In
ConsultaAccording to Ethiopian Electric Power Corporation (EEPCo) annual bulletin of 2011/2012, concerning quality of supply, the service quality in the electrified areas is not satisfactory. This is due to poor design, lack of care and negligence during implementation, and lack of scheduled maintenance.
ConsultaTrituradora de piedra vendida por proveedores certificados, como trituradoras de mandíbula/cono/impacto/móvil, etc.
OBTENER COTIZACIÓN