9 December 2016. The solar farm at the Siu Ho Wan Sewage Treatment Works of the Drainage Services Department (DSD) came into operation on December 9. The largest of its kind in Hong Kong, the solar farm comprises over 4,200 polycrystalline photovoltaic panels with an installed generation capacity of 1,100 kilowatts.
Consulta43/F, AIA Kowloon Tower, 100 How Ming Street, Kwun Tong, Kowloon, Hong Kong. Telephone Number: (852) 2601 1000. Fax Number: (852) 2601 3988. E-mail address: [email protected]. Closing Date / Time : 12:00 noon on Friday, 13 August 2021. (The closing time has been extended to 12:00 noon on Friday, 27 August 2021)
ConsultaScope of Works. 2.1 Contract 1702 will be tendered and awarded, using NEC4 Engineering and Construction Contract June 2017 (with amendments October 2020) – Option C: Target contract with activity schedule. In keeping with the Corporation’s partnering approach, preference will be given to the contractors who can clearly demonstrate and
ConsultaProject Background. The Organic Waste Treatment Facilities (OWTF) Phase I development (hereinafter referred to as “the Project’) is to design, construct and operate a biological treatment facility with a capacity of about 200 tonnes per day and convert source-separated organic waste from commercial and industrial sectors (mostly food waste
ConsultaThe Solar Farm at Siu Ho Wan Sewage Treatment Works, commissioned in December 2016, comprises over 4,200 polycrystalline photovoltaic ( PV ) panels and it is the largest of its kind among the government facilities. The Solar Farm is divided into three main areas, covering a total area of 11,000 square metres. An intelligent automatic detection
ConsultaExtension of Siu Ho Wan Water Treatment Works from the capacity of 150,000 m3/day to 300,000 m3/day with an option for further uprating to 350,000 m3/day together with the
ConsultaSiu Ho Wan Sewage Treatment Works (SHWSTW) was a Preliminary Sewage Treatment Works when it was first commissioned in 1998. The plant was subsequently upgraded to Chemically Enhanced Primary Treatment
ConsultaThe existing sewage rising main between Tung Chung and Siu Ho Wan is the only pipe for conveying sewage in the area. It is approaching the end of its design life of 25 years.
ConsultaThey were hired by Jacobs China Limited (JCL) – a contractor for the Civil Engineering and Development Department (CEDD) – and mainly worked at the Siu Ho Wan Public Works Regional Laboratory.
Consulta“Siu Ho Wan water treatment works extension detailed study, – design and site investigation” at an approved project estimate of $111.5 million in MOD price. We engaged a consultant in August 2018 to undertake the detailed design and site investigation
ConsultaSiu Ho Wan Water Treatment Works is a key component of the permanent system to supply water to the Hong Kong International Airport, the residential developments at
ConsultaSiu H o Wan Sewage e Treatm ment Wo orks. Fina ally, the 3--hour tour w was ended at 12:00 n noon and all particip pants had a fruitful Satturday morn ning with h rounds off applause ffor organizing by the tteam of B BSOMES a and EIHK. We would like to express our sincere tha anks to Ir D David HO a and the team of Dra ainage Serviices
ConsultaConcrete batching plants owned by Golik Concrete Ltd. and Quon Hing Concrete Ltd. are located to the north, while Siu Ho Wan Sewage Treatment Works is located to the west
ConsultaHome › Ongoing Project › Contract No. 7/WSD/21 Construction of the Expansion Section of Siu Ho Wan Filtration Plant and Siu Ho Wan Raw Water Booster Pumping Station Project Cases Project Overview
Consultasiu ho wan concrete plant-romainlaffont.fr Advance Concrete Drill Cut Co Ltd. Demolition work for Siu Ho Wan Sewerage Plant: More Photo >>> Under the renovation work for the sewerage plant, a concrete wall of thickness 600 mm needed to be
ConsultaEnvironmental Mitigation Implementation Schedule for the Schedule 2 DP Element – Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot \\HKGNTS22\acoustic\env\project\248118\12 Reports Deliverables\018
ConsultaConcrete Lorry Mixer (CNP044) (50%) 1 106 106 101 106 106 101 Grout Pump (CNP106) (100%) 1 105 105 90 105 105 90 Project: Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot Title: Plant Inventory for SWL of
ConsultaRecently the largest solar power farm, located at the Siu Ho Wan Water Treatment Works, was officially put into operation. This solar power farm, consists of 4,200 pieces of polycrystalline silicon photovoltaic modules, is expected to generate 1.1 million kWh of solar power per year. And in the meantime, it can help reduce annual carbon dioxide
Consulta54. Mr Louis Chan clarified that under the EIAO, ACE might provide comments to DEP within 60 days of its receiving a copy of the report. Mr C F Wong supplemented that under the provision of the EIAO, DEP would make a decision on the approval / rejection of the EIA report after receiving the further information. 55.
ConsultaTreatment Works) on the Siu Ho Wan Layout Plan No. L/I-SHW/1, with a Sewage Treatment Plant to the west, North Lantau Service Road to the north and North Lantau Highway about 100 m away. The layout plan of the Siu Ho Wan WTW is shown in Figure 2.
ConsultaSiu Ho Wan is one of the first ecoshorelines in Hong Kong. We evaluated the biodiversity enhancement in CEDD's Siu Ho Wan ecoshoreline trial design and presented our findings in BECoME 2022. 07 Hoi Ha Wan Project The Hoi Ha Wan Marine Park is one of
ConsultaLung Kwu Tan and Siu Ho Wan from August 2013 to February 2014 for Ecological Impact Assessment Green Island Cement Plant, Shiu Wing Steel Mill, Permanent Aviation Fuel Facility, EcoPark, River Trade Terminal, etc. 3.2 Some ecological significant
ConsultaSiu Ho Wan Sewage Treatment Works 2006 5.2 (Chemically Enhanced Primary Treatment) North Western Anglers’ Beach Stanley Sewage Treatment Works 1995 0.8 (Secondary Treatment) Southern Stanley Main Beach, Hairpin Beach, Turtle Tai O0.1
Consulta1.1.2 The Environmental Impact Assessment (EIA) Report (Register No.: AEIAR-214/2017) for the SHO and SHD Replanning Works (hereafter referred to as the “Project”) was approved on 29 November 2017 under the Environmental Impact Assessment Ordinance (EIAO). Following the approval of the EIA Report, an Environmental Permit (EP) was
ConsultaTotal length of sewerage network about 1,770 kilometres. Public sewerage network serves around 93.5% of Hong Kong's population 1. About 380,000 tonnes of sludge collected and treated in the year. A total of 314 DSD owned sewage treatment facilities. In 2017-18, a total of about 1,007 million cubic metres of sewage was treated.
Consulta2.1.1.3 Without the Project, Siu Ho Wan will remain as a low-rise industrial area with an open air depot on-site. The proposed new community and public transport facilities will not be materialised and the development potential of Siu Ho Wan area will be
ConsultaTender Notices. Tender Reference : Contract No. 7/WSD/21. Procuring Department : Water Supplies Department. Subject : Construction of Siu Ho Wan Water Treatment Works
ConsultaThe solar farm at the Siu Ho Wan Sewage Treatment Works of the Drainage Services Department (DSD) came into operation on December 9. The largest of its kind in Hong
ConsultaThis is the twenty-ninth monthly EM&A Report fo r Contract No. DC/99/10- Upgrading of Siu Ho Wan Sewage Treatment Plant Civil Works, which records the results and findings of all EM&A work required in the EM&A Manual for the month of January 2004.